i. This Monthly Environmental Monitoring and Audit (EM&A)
Report is prepared for Contract No. SPW 07/2020 ¡§Environmental Team for
Construction of Yuen Long Effluent Polishing Plant Stage 1¡¨. Drainage Services
Department (DSD) has appointed Fugro Technical Services Limited (FTS) to
undertake the Environmental Team services for the project and implement the
EM&A works.
ii.
This is the 2nd Monthly
EM&A Report for the Contract which summaries findings of the EM&A programme
during the reporting period from 1 May 2021 to 31 May 2021. As informed by the
Contractor, major activities in the reporting month were:
¡P
Driven
piling works at IW;
¡P
Demolition
of PST no. 7 & 8 tanks;
¡P
Construction
of temporary storage area, admin. building & workshop;
¡P
Excavation
of trench for Zone 1 diversion;
¡P
Erection
of bird curtain;
¡P
Pre-drilling
work by 3 drill rigs;
¡P
Installation
of instrumentation; and
¡P
Overhauling
works.
Breaches of Action and Limit Levels
iii.
No Action and Limit Level
exceedance was recorded for air quality monitoring and construction noise
monitoring in the reporting month.
iv.
Three Action Level
exceedance were recorded for water quality in the reporting month. The
exceedance were recorded at M1 on 22 May 2021 and recorded at M3 on 27 and 29
May 2021. Six Limit Level exceedance were recorded for water quality in
the reporting month. The exceedance were recorded at M1 and M3 on 25 and 27 May
2021. It was found that these exceedances were not project-related.
vi.
Two exceedances in
Action Level were recorded for the ecological monitoring of birds on 17 May
2021, in which significant declines were found in species diversity of all
avifauna species in the community; and species diversity of species of
conservation importance only. However, the exceedances were not
project-related.
Complaint Log
vii.
No complaints were
received in the reporting period.
Notifications
of any Summons and Successful Prosecutions
viii.
No notifications of
summons and prosecutions were received in the reporting period.
Reporting Change
ix.
There were no reporting
changes during the reporting month.
Future Key Issues
x.
The main works will be
anticipated in the next three months are as follow:
¡P
Driven
piling work at IW;
¡P
Demolition
of PST no. 7 & 8 tanks;
¡P
Demolition
of main store;
¡P
Demolition
of carpark cover;
¡P
Demolition
of workshop;
¡P
Sheet
piling;
¡P
Construction
of temporary storage area, admin. Building and workshop;
¡P
Installation
of sheet piles for Zone 1 diversion;
¡P
Pre-drilling
works at PST;
¡P
Environmental
drill holes inside main store and workshop;
¡P
Trench
excavation for UU diversion; and
¡P
Breaking
of existing road pavement at PST.
8. ENVIRONMENTAL COMPLAINT AND NON-COMPLIANCE
9. IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION
MEASURE
Tables
Table 1.1 Contact Information of Key Personnel
Table 1.2
Environmental Licenses, Notification and Permits Summary
Table 2.1
Air Quality Monitoring Equipment
Table 2.2
Air Quality Monitoring Location
Table 2.3 Summary of Air
Quality Monitoring Results
Table 2.4 Comparison of 1-hr
TSP data with EIA predictions
Table 3.1
Construction Noise Monitoring Equipment
Table
3.2 Monitoring Parameters and Frequencies of Noise Monitoring
Table 3.3
Construction Noise Monitoring Location
Table 3.4
Summary of Construction Noise Monitoring Results
Table
3.5 Comparison of Noise monitoring data with EIA predictions
Table
4.1 Water Quality Monitoring and
Sampling Equipment
Table
4.2 Monitoring Parameters and
Frequency
Table
4.3 Coordinates of Water Quality Monitoring Locations
Table
4.4 Summary of Water Quality Exceedance
Table
5.1 Noise Monitoring Parameters (For Active Ardeid Night Roost Survey)
Table
5.2 Active Ardeid Night Roost Survey Findings
Table
5.3 Noise Monitoring Results (For Active Ardeid Night Roost Survey)
Table
5.4 Noise Monitoring Parameters
Table
5.5 Abundance of all Avifauna Species
Table
5.6 Abundance of Species of Conservation Importance
Table
5.7 Shannon Diversity Index Value of all Avifauna Species
Table
5.8 Shannon Diversity Index Value of Species with Conservation Importance
Table
5.9 Wetland habitat utilization of all avifauna species
Table
5.10 Wetland habitat utilization of conservation importance
Table
5.11 Wetland habitat utilization of overwintering avifauna species
Table
5.12 Noise Monitoring Results (For Ecological Monitoring of Birds)
Table 7.1 ¡V Waste Generated by the Construction and Disposal Ground
Figures
Figure 1 General Layout of the Proposed Yuen Long Effluent
Polishing Plant
Figure 2 Air Quality Monitoring Locations
Figure 3 Noise Monitoring Locations
Appendices
Appendix A Construction
Programme
Appendix B Project
Organization Chart
Appendix C Action
and Limit Levels
Appendix D Calibration
Certificate of Monitoring Equipment
Appendix E Environmental
Monitoring Schedule
Appendix H Event
and Action Plan
Appendix J Implementation
Status of Environment Mitigation Measures
Appendix K Weather
and Meteorological Conditions
Appendix M Summary
of Observations and Findings in the Reporting Month
Appendix N Outstanding
Issues and Deficiencies
Appendix O Active
Night Roost Monitoring Area and Vantage Points; and Noise Monitoring Stations
Appendix P Ecological
Bird Monitoring Area with Locations of Point Count Sites and Transect Route